IN-EKO today


The last installation of our equipment in 2011 was at WWTP Sosnovy Bor in Russia. Installation was done between 18th and 22nd December 2011.

6 pieces of equipment were supplied for this application. It was 3 pcs of Belt screens, 1 pc of Screw conveyor, 1 pc of Screw press and 1 pc of Sand separator. WWTP is designed for Qmax 1914 l/s.

High demands on material processing as well as high-standard installation were there.

obr1 obr2 obr5

EU THE EUROPEAN REGIONAL DEVELOPMENT FUND AND THE MINISTRY OF INDUSTRY AND TRADE OF THE CZECH REPUBLIC SUPPORT INVESTMENT IN YOUR FUTURE